Wonders High-Leverage Creative Activation Fund
The detailed layer behind the $15,000 CAD ACTIVATE → CREATE → OWN campaign
PHASE 1 STATUS — CURRENT ACTIVE DEVELOPMENT CAMPAIGN
This page explains:
- what the current Phase 1 campaign is designed to fund;
- how the working budget is structured;
- which figures are local estimates, planning allocations or conditional reserves;
- how the Festival’s free-entry / optional Supporter Pass model is being approached;
- how the final OWN milestone now capitalizes the first local earned-income pathway;
- what must be confirmed before implementation;
- how funds are currently coordinated;
- and how meaningful changes will be documented.
The campaign remains:
$5K ACTIVATE → $10K CREATE → $15K OWN
The total goal remains:
$15,000 CAD
Return to Phase 1 — Creative Activation →
1. Currency and evidence conventions
For this Phase 1 budget:
UGX = local / implementation reference
CAD = primary public planning / fundraising reference
Current working planning rate:
1 CAD ≈ 2,550 UGX
CAD conversions are approximate.
UGX remains the more useful implementation reference.
Evidence-status language
Working allocation
A deliberate planning envelope for a complete function or package.
Reported local / working estimate
A price or operating figure reported from the local context and useful for current planning, but not necessarily a current written supplier quotation.
Conditional reserve
Money held for a purpose that cannot responsibly be spent until a condition or verification step is complete.
Pending specification
The function is funded, but exact product/vendor/components remain to be selected.
Projected operating scenario
Arithmetic used to test whether a business or program mechanism could work.
It is not actual operating performance.
A budget can be responsible without pretending every number has the same level of certainty.
2. Budget at a glance
| Milestone | Cumulative CAD ceiling | Cumulative UGX ceiling | Main function |
|---|---|---|---|
| ACTIVATE | $5,000 | 12.75M UGX | operating base + first Festival / creative cycle |
| CREATE | $10,000 | 25.5M UGX | internal media + registration reserve + first Dance Residency |
| OWN | $15,000 | 38.25M UGX | $5K final capitalization envelope for the first locally controlled earned-income engine; initial deployment is smaller and the balance remains protected pending evidence |
Current working cumulative arithmetic:
~37.31M–37.36M UGX
against the:
38.25M UGX
full campaign ceiling.
That leaves approximately:
890K–940K UGX of campaign-level implementation flexibility
under the current working assumptions.
That space is not an invitation to add another project.
It exists because real implementation involves sourcing, transport, setup, exchange movement and unexpected friction.
OWN behaves differently from an ordinary purchase list
Reaching the $15K campaign ceiling dedicates the final $5K to the earned-income pathway.
It does not mean the whole $5K should be spent immediately.
The first BWC pilot currently has a smaller working authorization ceiling.
The remaining earned-income capital stays protected until real operating evidence justifies expansion.
3. $5,000 — ACTIVATE
Create the secure operating and communications base and execute the first real Festival / creative-activation cycle
ACTIVATE working ledger
| Component | Working amount | Status / note |
|---|---|---|
| Secure office package | 1.275M UGX | Working allocation; includes first 2 months rent |
| Dedicated smartphone | 1.785M | Working allocation |
| Dependable computer | 3.06M | Working allocation |
| Everyday Dance Academy speaker | 700K | Current local working cost |
| Banner #1 | 500K | Working/local cost input |
| First-Festival PA rental | 1M | Reported/working event cost |
| Decorations | 500K | Working event allocation |
| Tent rental | 300K | Reported/working event cost |
| Seating rental | 300K | Reported/working event cost |
| Festival food / hospitality envelope | 2M | Working allocation; redesigned around free entry + optional Supporter Pass pilot |
| Large-pot rental | 100K–150K | Current working rental estimate |
| Professional Festival media crew | 1M | Four-person photo/video team |
| ACTIVATE total | 12.52M–12.57M UGX | Approximately $4,910–$4,929 CAD |
| Nominal room below 12.75M ceiling | 180K–230K | Tight; sourcing discipline required |
ACTIVATE remains a tightly allocated milestone.
Before authorizing the first Festival and major purchases, sourcing should aim to preserve practical implementation room for matters such as local transport, data, charging/power protection, drinking water, sanitation, setup/cleanup and small procurement friction.
4. Office and operating base
Initial office package:
1.275M UGX
Current decomposition:
- first two months rent: 600K UGX;
- desk / seating / cabinet-storage / safe-chest / basic setup: approximately 675K UGX.
After the funded first two months:
office rent ≈ 300K UGX/month
That continuing cost is an operating responsibility.
This one-time development campaign does not permanently fund it.
Monthly Stability & Operating Needs →
5. Core communications and creative tools
Smartphone
1.785M UGX / approximately $700 CAD
Working allocation for a dependable dedicated smartphone supporting communication, local coordination, publishing, lightweight photography/video, Festival organization and documentation.
Computer
3.06M UGX / approximately $1,200 CAD
Working allocation for administration, registration work, records/documents, graphics, photo/video work, supporter communication, Festival planning, reporting and storage.
Everyday Dance Academy speaker
700K UGX / approximately $275 CAD
Current local working cost for routine practice, choreography, teaching, rehearsal and smaller gatherings.
The first Festival continues to rent event-scale sound.
First reusable banner
500K UGX / approximately $196 CAD
Reusable across Festival, Dance Academy and community activity.
6. The first Community Dance & Arts Festival
The Festival remains a real activation and learning cycle.
Current fixed / working first-event lines outside the food/hospitality envelope:
| Festival line | Working amount |
|---|---|
| PA / event sound rental | 1M UGX |
| Decorations | 500K |
| Tent rental | 300K |
| Seating rental | 300K |
| Large-pot rental | 100K–150K |
| Professional photo/video team | 1M |
Festival food / hospitality remains:
2M UGX
but its function is refined.
The earlier model treated this mainly as:
1,000 meal servings × approximately 2,000 UGX
The revised Festival architecture now keeps:
Festival entry free
and develops an optional:
10,000 UGX Supporter Pass
The working Supporter Pass bundle includes:
- one hand of bananas;
- one simple meal;
- one homemade tamarind + water + honey drink.
The pass is not required for entry.
It is a voluntary purchase that can:
- help recover part of the Festival cost;
- introduce people to buying from Wonders;
- move Marketplace products;
- and preview the future Café model.
First-Festival pilot versus later scale
The first Festival should test a bounded Supporter Pass pilot inside the existing 2M UGX food/hospitality envelope and actual cash-flow capacity.
It should not assume that 500 passes will sell before the Marketplace itself is capitalized.
A 500-pass scenario is preserved below as a useful scale model for later Festivals and for understanding the economics if demand develops.
7. Supporter Pass working arithmetic
Banana cost
Current BWC planning:
one banana bunch costs 50K UGX
and averages approximately:
9 hands per bunch
Working banana cost per hand:
approximately 5,556 UGX
Simple meal
Current rough planning:
1,250 UGX per simple included meal
This is a working assumption pending the actual Festival menu and sourcing.
Tamarind + water + honey drink
Current rough planning allowance:
~500 UGX per ~250 ml glass
Working large-batch planning reference:
~500K UGX for approximately 1,000 glasses
This should be tested locally through a small batch before implementation.
500 Supporter Pass scale scenario
This is a scenario, not a sales forecast.
| 500 optional Supporter Passes | Working amount |
|---|---|
| Pass revenue — 500 × 10K | 5.000M UGX |
| 500 banana hands — attributable cost | ~2.778M |
| 500 simple meals — 500 × 1,250 | 625K |
| 500 tamarind drinks — 500 × ~500 | 250K |
| Working contribution margin | ~1.347M UGX |
Because complete banana bunches must be purchased, 500 hands require approximately:
56 bunches × 50K = 2.8M UGX cash outlay
Using that full cash outlay:
5.000M − 2.800M − 625K − 250K = 1.325M UGX
with approximately four banana hands remaining beyond the 500-pass allocation.
Current rough planning range:
~1.25M–1.4M UGX Festival Supporter Pass contribution per 500 passes
before wider Festival fixed costs.
Do not describe this as guaranteed Festival profit.
Use:
working Supporter Pass contribution margin
because pass sales are uncertain and actual food/drink/event costs may change.
Donations and sponsorships are not included in this base model.
8. Why keep Festival entry free?
The Festival is intended to be a community gathering.
A mandatory gate fee could exclude some of the local people the Festival is supposed to include.
The preferred architecture therefore separates:
access to the gathering
from:
optional financial participation
People may attend without buying a Supporter Pass.
The Supporter Pass is one way to support Wonders while receiving a useful Festival bundle in return.
A person who does not purchase a pass should not be framed as less welcome, less supportive or less part of the community.
9. Why the Festival and Marketplace connect
Creative / relationship function
gather → perform → document → share → build relationships → learn
Local-commerce function
gather → optional first purchase from Wonders → Marketplace familiarity → possible repeat local purchasing
At ordinary projected BWC banana sales:
~0.5 banana bunch/day ≈ ~15 bunches/month
A 500 Supporter Pass scenario requires approximately:
56 bunches
That would be a large one-event banana sales volume.
It does not prove that later repeat demand will exist.
One useful Festival metric may therefore be:
How many people who first purchase through the Festival later become Marketplace customers?
No conversion percentage is assumed.
10. Professional Festival documentation
Professional media crew:
1M UGX
for the first Festival.
That remains separate from the campaign’s internal media investment.
Professional event documentation allows a dedicated team to focus on a major gathering while Kendrick and the local team operate the event.
The internal media system funded through CREATE supports the wider rhythm between major events.
Children and participants do not need to become evidence objects.
Media remains subject to consent, privacy and dignity.
11. $10,000 — CREATE
Build internal media-production capability, protect institutional development and run the first Dance Residency pilot
CREATE additions
| Component | Working amount | Status / note |
|---|---|---|
| Camera kit | 2.55M UGX | Working allocation for usable kit |
| Media workflow / accessories | 1.9125M | Working allocation |
| Microphones | 765K | Pending final specification |
| Banner #2 | 500K | Working/local cost input |
| Banner #3 | 500K | Working/local cost input |
| 10 shirts — existing Wonders dance team | 500K | Working local cost |
| First Dance Residency pilot | 3.81M | Working pilot budget |
| Registration reserve | 1.5M | Conditional reserve |
| CREATE additions | ~12.04M UGX | |
| Cumulative through CREATE | ~24.56M–24.61M UGX | |
| Cumulative ceiling | 25.5M UGX | |
| Working implementation room | ~890K–940K UGX | Preserve as margin |
Do not fill this headroom simply because it exists.
12. Internal media-production system
Camera kit
2.55M UGX / approximately $1,000 CAD
Intended as a usable camera kit rather than an incomplete body-only purchase.
Media workflow and accessories
1.9125M UGX / approximately $750 CAD
Possible components may include:
- tripod;
- memory cards;
- external storage;
- spare battery;
- protective case/bag;
- cables/adapters;
- card reader;
- charging equipment;
- power protection.
The objective is:
capture → transfer → store → edit → publish → archive → reuse
Microphones
765K UGX / approximately $300 CAD
Exact package remains a sourcing decision.
If sourcing reveals overlap with other equipment, treat the difference as a saving rather than automatic permission to spend elsewhere.
13. Reusable identity materials
By CREATE:
3 reusable banners in total
Current working investment:
1.5M UGX total
CREATE also carries:
10 shirts × 50K UGX = 500K UGX
for the existing Wonders dance team.
These are distinct from Residency-team shirts.
14. First Dance Residency pilot
Current working cohort:
approximately 8–10 dancers for one month
| Residency component | Working amount |
|---|---|
| Room | 300K UGX |
| 7 reusable mattresses | 1.26M |
| 10 sheet sets | 1M |
| 10 Residency-team shirts | 500K |
| Food | 750K |
| First-month total | 3.81M UGX / ~$1,494 CAD |
The mattresses and sheets are reusable.
Current working room + food continuation cost for the same cohort:
1.05M UGX/month
Future cohorts are not automatically funded by this campaign.
Residency activation gate
Before the residential pilot begins, confirm:
- participant ages/categories;
- adult/minor distinctions;
- supervision;
- privacy;
- sleeping arrangements;
- gender considerations;
- sanitation;
- transport;
- consent/media;
- house expectations;
- conflict handling;
- any additional participant-support needs.
Support must never require public media participation, fundraising participation, trauma disclosure or gratitude performance.
15. Registration reserve
CREATE preserves:
1.5M UGX / approximately $588 CAD
as a conditional registration reserve.
Wonders is not yet legally registered with Ugandan authorities.
The 1.5M UGX figure is not a verified final all-inclusive legal cost.
Before any registration payment, confirm:
- final legal form/pathway;
- responsible authority;
- applicable current fees;
- payment destination;
- documentation/process.
The intended future Café & Marketplace activity should operate through the appropriate Wonders legal / organizational structure once that structure exists and the applicable commercial requirements are understood.
Registration funding does not itself prove that trading may begin.
16. $15,000 — OWN
Own more of the means to continue
The final $5,000 tranche is:
a protected capitalization envelope for the first Wonders Café & Marketplace earned-income pathway
The first business stage is:
BWC — Bananas + Firewood + Charcoal
The first pilot is deliberately smaller than the full OWN envelope.
The remaining capital stays protected until actual operating evidence justifies expansion.
17. How mature are the BWC inputs?
| BWC input | Current working value | Evidence status |
|---|---|---|
| Banana purchase price | 50K UGX / bunch | Reported local figure — Kendrick |
| Banana proposed selling price | 65K UGX / bunch | Current local selling plan |
| Banana ordinary sales velocity | ~0.5 bunch/day | Projected local sales estimate |
| Firewood purchase price | 100K UGX / sack | Reported local figure — Kendrick |
| Firewood proposed selling price | 120K UGX / sack | Current local selling plan |
| Firewood sales velocity | ~1 sack/day | Projected local sales estimate |
| Charcoal purchase price | 100K UGX / sack | Reported local figure — Kendrick |
| Charcoal proposed selling price | 120K UGX / sack | Current local selling plan |
| Charcoal sales velocity | ~1 sack/day | Projected local sales estimate |
| Transport | ~75K UGX / trip; ~2 trips/month | Reported local working estimate |
| Storage | 300K UGX / month | Reported local working estimate |
| Simple wooden stand | ~255K UGX | Working planning allowance — needs local confirmation |
| Startup / implementation reserve | ~500K UGX | Working planning allowance |
| Base monthly operating contribution | ~975K UGX | Derived projected scenario — not actual operating performance |
The arithmetic can be exact even when the underlying sales assumptions remain provisional.
The purpose of the first pilot is to replace projections with real operating evidence.
18. BWC monthly base-case scenario
Using the current local sales estimates over a 30-day month:
| Product | Monthly stock cost | Monthly sales revenue | Gross trading margin |
|---|---|---|---|
| Bananas | 750K UGX | 975K UGX | 225K UGX |
| Firewood | 3.0M | 3.6M | 600K |
| Charcoal | 3.0M | 3.6M | 600K |
| Total | 6.75M UGX | 8.175M UGX | 1.425M UGX |
Current known additional monthly operating estimates:
| Cost | Working amount |
|---|---|
| Transport — ~75K/trip × ~2 trips | 150K UGX |
| Rented storage building | 300K |
| Known monthly costs beyond stock | 450K UGX |
Current base scenario:
1.425M gross trading margin
minus:
450K known transport/storage
=
975K UGX projected operating contribution
before still-unmodeled costs such as:
- adult labour/compensation;
- taxes/licences if applicable;
- spoilage;
- shrinkage/theft;
- packaging or selling materials;
- cash/bookkeeping needs;
- price changes;
- other local operating expenses.
Do not call 975K UGX final net profit.
Use:
projected operating contribution before unmodeled expenses, labour, tax/licensing, losses and distributions
The real test is real trading.
19. Banana staged collection
Kendrick reports a strong possibility of arranging for bananas to be collected progressively rather than all at once.
If confirmed, this could reduce spoilage risk and unnecessary physical storage.
It does not automatically reduce total cash tied up unless the final supplier arrangement says so.
The startup budget therefore uses a cautious opening banana allowance rather than assuming the full monthly banana volume must be physically stored at Wonders.
20. Initial BWC launch budget
Opening trading stock
| Component | Working amount |
|---|---|
| Firewood — 15 sacks × 100K | 1.50M UGX |
| Charcoal — 15 sacks × 100K | 1.50M |
| Bananas — up to 5 prepaid bunches × 50K | 250K |
| Opening trading-stock allowance | 3.25M UGX |
First-cycle setup
| Component | Working amount |
|---|---|
| First-month transport | 150K UGX |
| First-month storage | 300K |
| Simple wooden stand | ~255K |
| Startup / implementation reserve | ~500K |
| Initial BWC authorization ceiling | ~4.455M UGX |
At the current working planning conversion:
~4.455M UGX ≈ ~$1,750 CAD
This is a working launch ceiling, not procurement authorization.
21. Full OWN capitalization envelope
Incremental final campaign tranche:
$5,000 CAD ≈ 12.75M UGX
| Function | Working amount |
|---|---|
| Initial BWC authorization ceiling | ~4.455M UGX |
| Protected earned-income growth capital | ~8.295M |
| Total OWN capitalization envelope | 12.75M UGX / ~$5K CAD |
Core rule:
Dedicated does not mean immediately spent.
Potential later uses may include:
- deeper stock in proven products;
- new staple categories supported by real demand;
- stronger storage/security;
- sales fixtures;
- compliance/business setup costs where applicable;
- Café activation;
- later commercial space;
- Festival or Café infrastructure that repeated use justifies;
- other directly connected earned-income capacity.
Do not spend the balance merely to use the full milestone.
22. Working-capital protection
The Marketplace should not become another emergency wallet.
Intended cash sequence:
sales revenue
→ replace stock sold
→ pay direct operating costs
→ restore/protect working capital
→ provide for labour/compliance/maintenance obligations
→ reinvest according to an approved growth decision
→ only then identify true distributable surplus
No fixed surplus-allocation percentage is promised.
Possible later uses of true surplus may include:
- ongoing care and operating needs;
- business growth;
- Café development;
- Festival costs;
- reusable practical/event assets;
- reserves.
Real performance should decide what the business can responsibly carry.
23. What comes after BWC
The umbrella concept is:
Wonders Café & Marketplace
but the Café is not required for BWC to begin.
Business Stage 1 — BWC Marketplace
Bananas + firewood + charcoal.
Business Stage 2 — Café on the current compound
Current concept:
- same general location;
- same rented storage structure;
- simple tables/chairs;
- small meal/drink menu;
- evidence-based activation after BWC proves operational control.
Current working furniture/serviceware reference:
| Item | Qty | Working subtotal |
|---|---|---|
| Plastic dining chairs | 20 | 500K UGX |
| Plastic dining tables | 5 | 750K |
| Dinner plates | 20 | 90K |
| Forks | 20 | 50K |
| Spoons | 20 | 50K |
| Total | ~1.44M UGX |
This is not part of the initial BWC authorization ceiling.
Business Stage 3 — Future market-centre concept
A possible later Café & Marketplace location near the market centre.
This is a future concept only.
No site, half-acre purchase, build budget or implementation commitment is created by Phase 1.
24. Useful assets still worth considering later
Earlier Phase 1 planning identified several reusable assets that could reduce later Festival or practical operating costs:
- tenting;
- seating;
- larger event sound;
- large cooking pots;
- sewing capability.
They remain potentially useful.
The current capital priority is to build the earned-income engine first and let actual Festival use, business evidence, sponsorship or later funding help determine which of those assets are worth owning next.
This preserves useful planning truth without making the reader reconstruct an obsolete current-campaign ledger.
25. Adult-operation and child-protection boundary
The Marketplace must be economically viable without depending on child labour.
The operating model should assume adults can carry procurement, storage, sales, cash, records, restocking and supplier communication.
Do not build the business model around children:
- carrying heavy commercial loads;
- working sales shifts as a condition of care;
- missing school;
- producing income required to sustain their own care.
Any later youth learning/participation concept would require separate lawful, voluntary, age-appropriate and safeguarding review.
Caregiver time also has economic value.
Do not treat adult labour as permanently free.
26. Legal, tax, trading and sourcing gate
The intended model is for Café & Marketplace operations to sit within the appropriate Wonders organizational/legal structure once that structure is established.
Before commercial activation, clarify:
- final nonprofit/legal form;
- whether/how commercial activity sits inside that structure;
- tax/TIN treatment;
- local trading permissions;
- accounting treatment;
- cash/inventory responsibility;
- relationship between donated funds and business funds;
- lawful charcoal/firewood sourcing;
- storage/security;
- any later Café-specific food/public-health requirements.
The registration reserve and the business/trading gate are related.
They are not the same thing.
Do not imply that nonprofit registration automatically authorizes every commercial activity.
27. Campaign-level implementation margin
Current working cumulative total:
~37.31M–37.36M UGX
Full campaign ceiling:
38.25M UGX
Current working room:
~890K–940K UGX
This should remain campaign-level implementation flexibility unless a deliberate later material-change decision reallocates it.
Do not automatically add it to BWC inventory, expand the Festival or spend it because the campaign reaches $15K.
28. Development cost versus ongoing operation
Phase 1 changes conditions.
It does not permanently fund everything those new capabilities require.
Ongoing responsibilities include:
- office rent after the funded startup period;
- data/connectivity;
- electricity/charging;
- technology maintenance/repair/replacement;
- Marketplace storage;
- adult operating labour;
- future business compliance;
- future Festival delivery;
- future Residency periods;
- Café operating costs if Stage 2 is activated.
Monthly Stability & Operating Needs →
The existence of the Marketplace does not make recurring monthly support obsolete.
29. One need once
Where a durable Phase 1 asset is still useful and compatible later, the wider Roadmap follows:
one need once
Potential carry-forward may include:
- smartphone;
- computer;
- camera/media system;
- microphones;
- banners;
- office/storage assets where applicable;
- later business fixtures or equipment actually purchased through OWN.
Temporary rentals, food, professional services, Residency delivery and other consumed/time-bounded costs remain Phase 1 costs.
Because the previous tent / seats / large PA / pots / sewing package is no longer a current Phase 1 purchase promise, later Roadmap credit assumptions must be updated accordingly.
Explore the Wonders Development Roadmap →
30. Reaching a milestone is not implementation
Campaign progress and implementation are different states.
Where useful, distinguish:
Pledged → Received → Cleared → Transferred → Received Locally → Authorized → Purchased → Delivered → Implemented → Documented → Reported
A reached threshold does not automatically mean every purchase should be made immediately.
For OWN in particular:
the first BWC pilot may begin at a smaller scale while most of the final tranche remains protected.
31. How meaningful changes will be handled
If:
- a quoted item costs materially more or less;
- supplier availability changes;
- an included component proves unnecessary;
- a business estimate changes;
- Festival implementation changes;
- savings emerge through sourcing;
- a planned component becomes unwise;
the current record should explain:
- what changed;
- why;
- how the amount was reallocated or preserved;
- whether the change alters the campaign’s meaning.
When an actual purchase or implementation cost becomes available:
use the actual rather than continuing to present the earlier estimate as if both were equally current.
Material changes should be documented rather than hidden inside an old budget table.
32. Evidence and reporting
Where practical, reporting may include:
- quotations;
- transfer records;
- receipts;
- supplier information;
- purchase/delivery records;
- photographs of equipment or non-sensitive implementation;
- Festival documentation;
- simple business stock/sales summaries;
- material-change notes;
- milestone updates;
- completion summaries.
For BWC, a simple daily ledger should record:
- opening stock;
- stock purchased;
- units sold;
- sales revenue;
- closing stock;
- spoilage/loss/damage;
- cash expected;
- cash actually present;
- notes on stockouts or supplier changes.
Children and participants do not need to become the evidence.
Transparency should come primarily through records, implementation visibility and honest reporting.
33. How funds are currently coordinated
For now:
- Michael Petrakis receives and controls funds before approved transfers to Uganda;
- funds are currently sent through WorldRemit;
- funds are currently sent to Kendrick.
Humanity United is a federally registered Canadian nonprofit.
It is not currently a registered charity.
Canadian charitable tax receipts are therefore not available.
Humanity United is not the orphanage itself.
Wonders remains the grassroots care community locally led by Kendrick and the caregiver team.
The financial and institutional systems around the work are still developing.
They should be described that way.
34. What this Phase 1 campaign does not fund
This $15K campaign does not fund:
- the separate children’s clothing program;
- Phase 2 sleeping-place provision;
- the Phase 2 First Acre/Nourishment package;
- major water infrastructure;
- permanent sanctuary construction;
- Phase 3 mobility/transport;
- the wider permanent sanctuary.
It also does not permanently fund recurring monthly care.
Those responsibilities live elsewhere in the support architecture.
35. Questions and routes
Return to Phase 1 — Creative Activation →
Explore the Wonders Development Roadmap →
Monthly Stability & Operating Needs →
36. Closing budget summary
$5K — ACTIVATE
operating base + communications technology + everyday Dance Academy sound + first Festival / documentation cycle
Current working total:
12.52M–12.57M UGX
$10K — CREATE
camera/media workflow + microphones + reusable identity + registration reserve + first Dance Residency
Current cumulative working total:
24.56M–24.61M UGX
$15K — OWN
first locally controlled earned-income engine through Wonders Café & Marketplace, beginning with BWC
Final OWN capitalization envelope:
12.75M UGX / ~$5K CAD
Initial BWC authorization ceiling:
~4.455M UGX / ~$1.75K CAD
Protected earned-income growth capital:
~8.295M UGX
Current overall working total:
~37.31M–37.36M UGX
Campaign ceiling:
38.25M UGX / $15,000 CAD
Current campaign-level implementation room:
~890K–940K UGX
The objective is not to spend every available shilling.
It is to build complete, usable capability; protect implementation flexibility; learn from real use; and explain meaningful changes clearly.